Home ] Old Reports ] CARPET MILL LIST ] Links ] Goverment Standards ] Research ] Tests Procedures ] Tools ] Work Sheets ]


CLEANING INSPECTION WORKSHEET ] Direct Glue Down Worksheet ] [ Double GlueDown Worksheet ] Installation Errors Worksheets ] Pattern Match Worksheet ] Wood Worksheet ]


Home ]

 

Double GlueDown Worksheet

The Double Stick Installation Method has been very popular in the past few years and it is continuing to be installed in numerous facilities. However as an installation system, it has not gone without problems. Indicative of failures is buckling and seam separation. The culprit made is related to a single problem or a combination of problems.

 

Failure in the double stick method can occur from:

1. Problems from Moisture

  • From Geology
  • Water Tables
  • Soils
  • Alluvial plain
  • Hillside lot(cut or filled)
  • Land use changes ( low density to high density)
  • From Concrete
  • Water/cement ratio
  • Curing
  • Use of Visqueen
  • From Landscaping
  • Sprinkler systems
  • Vegetation
  • Drainage, storm gutters
  • Drainage (swells) impedance of flow
  • · From Maintenance
  • HVAC(Temperature, humidity)
  • Waiting period before cleaning
  • System (frequency)

2. From Adhesive

  • Solids, filler load, ash content, viscosity, pH

3. From Cushion

  • Type (correct)
  • Laboratory test (Ash content, volatile matter, moisture absorbency)
  • Plasticizer migration affecting the adhesive

4. From errors in the installation

  • Floor preparation (patch, VAT OR OLD CUTBACK ADHESIVE REMOVED)
  • Acclimation
  • Proper Tools, correct trowel size
  • Correct Adhesive
  • Proper Open Time

5. From Manufacturing

  • Dimensional stability

underConstruction.gif (20222 bytes)